BUILDING RENOVATION
BERKELEY, CA

DESCRIPTION:

Structural upgrade an 18,000 sf concrete tilt-up shear wall building with new steel frames. A 20-foot high free standing steel frame structure was added to support a curved signage and glass canopy created a covered front entrance. Also added 50 parking spaces to the front of the building with new drainage system, lighting, and landscaping for a modern shopping area as demanded by the becoming up-scaled neighborhood.

BASELINE was retained to provide both civil and structural engineering services for this project.