MEDICAL BUILDING – TENANT IMPROVEMENT AND ADDITION
SAN RAMON, CA

DESCRIPTION:

This project site contained two 2-story office buildings constructed around 1984. Tenant improvement work for these two buildings including a field investigation to obtain general structural systems of the two buildings, partition relocation without structural modification, adding a new exterior elevator, a new generator in the parking lot area, HVAC units on building roof for heating/air conditioning. The site improvement work includes grading, paving, storm drainage design, and concrete flatwork, curb cut, and retaining wall curb design.

 

BASELINE was retained to provide structural and civil engineering services for this project.